project: greenbrook

 

project location: greenbrook, nj

project status: completed

Dramatic changes were not in store for this property, as its six acres is nestled in a dense , natively occurring hardwood forest. instead, existing features like exposed bedrock, and large shade trees were amplified. The beauty of this design comes from subtle changes- an updated material palette creates cohesion and legibility in the design; gentle adjustments to angles and lengths of pathways allows space for mystery, and complexity. The drawings (conceptual and construction) were completed in 2022, and there are hopes of construction starting in 2024. Stay tuned.